Peter was the technical leader of a team working on the calibration of the BITFEM - a very detailed road and public transport model of Brisbane. Peter had a significant role in the specification and management of the calibration task and also did much of the analysis. The model developed was independently evaluated to be at least as good as any other integrated model in the world.